Project case study · Residential solar + storage
Dual GridBOSS + FlexBOSS Ground Mount
A 45.36 kW ground-mount design coordinating two independent EG4 power systems, 57.2 kWh of battery storage, whole-home backup, a standby generator, and long underground feeder runs.
The design challenge
Two PV-and-storage systems operating at one residence
The property required two hillside ground-mount arrays feeding two separate hybrid inverter and battery subsystems. Each subsystem needed its own protected DC and AC paths, microgrid interconnection device, backed-up loads, and coordinated relationship with the existing 120/240V service.
A 22 kW standby generator added another operating source. Long underground conduit runs from the arrays increased the importance of conductor sizing, routing, equipment locations, grounding, labeling, and a diagram that clearly explains normal, backup, and generator-fed operation.
Project identity and exact site details are withheld in the public sample.
Design response
Parallel architecture documented as a coordinated whole
Ground-mount PV
- 72 SEG Solar 630W modules total
- Two arrays of 36 modules each
- Long underground routes from array to equipment
Hybrid inverter systems
- Two EG4 FlexBOSS21 hybrid inverters
- Two EG4 GridBOSS interconnection devices
- Separate backed-up load centers coordinated
Battery and generator integration
- Four EG4 14.3 kWh PowerPro batteries
- 57.2 kWh combined storage capacity
- Generac Guardian 22 kW standby generator
Professional review package
- Project and site plans plus three-line diagrams
- Equipment data, certifications, and placards
- Plan set stamped by an Ohio professional engineer
What the plan set demonstrates
Backup capability requires explicit operating logic
A storage project is not fully communicated by listing batteries and an inverter. The drawings must show how sources, disconnects, backed-up loads, service equipment, and generator controls relate under different operating conditions. This set separates the two subsystems while showing how they coexist at the property.
The 21-page package also carries the design beyond the one-line concept. Site routing, equipment placement, conductor and protection details, placards, manufacturer requirements, battery certifications, and engineering review are assembled into one coordinated permit package.
Representative equipment
- SEG Solar SEG-630-BTZ-BG modules
- EG4 FlexBOSS21 hybrid inverters
- EG4 GridBOSS microgrid interconnection devices